The results of in-house or informal tests run before formal certification, such as emissions, immunity, electrostatic discharge, radio and safety checks, to find and fix problems before the system goes to an accredited laboratory.
Report Work product in the System development lifecycle
Formal certification tests are costly and booked well ahead, and a failure there can slip the release. Pre-compliance results find problems early and set the risk for each formal test.
The full lifecycle detail, with its charts, flows, tables and every section, is for registered members. Registration is free and takes a minute. You come back to this page afterwards.