Step-by-step instructions for production operators to set up, run, monitor and close test lots for the product, including hardware set-up, program loading, checks and reaction to alarms.
Guide or manual Work product in the Test program and ATE development lifecycle
It makes production test consistent across shifts and sites. Without it, operators set up hardware differently, alarms are handled inconsistently and errors such as running the wrong program go undetected.
The full lifecycle detail, with its charts, flows, tables and every section, is for registered members. Registration is free and takes a minute. You come back to this page afterwards.