The strategy for testing every system on the production line: which faults are caught at which test step, from board inspection and in-circuit or boundary scan test to functional test, calibration, burn-in and final system test.
Plan Work product in the System development lifecycle
It sets how the factory proves each unit is built right before it ships. Without a strategy fixed before design freeze, test access may be missing, test steps overlap or miss faults, and test time and cost are found only on the line.
The full lifecycle detail, with its charts, flows, tables and every section, is for registered members. Registration is free and takes a minute. You come back to this page afterwards.