The released procedure for testing each production tool in the factory before shipment, with test steps, acceptance limits and the record to be completed.
Test Work product in the Semiconductor equipment lifecycle
It makes every production tool pass the same checks before it leaves the factory. Test content that depends on the technician lets problems reach the customer site and stops build quality being measured consistently.
The full lifecycle detail, with its charts, flows, tables and every section, is for registered members. Registration is free and takes a minute. You come back to this page afterwards.