The report that closes design validation: the results of functional, performance, power, thermal, environmental, reliability, software and pre-compliance testing on the validation build, against every system requirement.
Report Work product in the System development lifecycle
It is the evidence that the design, not just a prototype, meets its requirements. The production validation build and certification depend on it, and gaps left here turn into field failures or certification delays.
The full lifecycle detail, with its charts, flows, tables and every section, is for registered members. Registration is free and takes a minute. You come back to this page afterwards.