The set-up for characterising the macro: the netlists, stimulus and measurements for each timing and power arc, the corners, the run scripts and the checks applied to the results.
Plan Work product in the Hard IP lifecycle
Views are only as good as the set-up that makes them. Preparing and checking it on the frozen layout means the final characterisation can run as soon as sign-off extraction is ready.
The full lifecycle detail, with its charts, flows, tables and every section, is for registered members. Registration is free and takes a minute. You come back to this page afterwards.