1. Purpose of the gate
Test program ready for silicon confirms the program loads, runs end to end and bins correctly on the tester with its hardware before silicon arrives. It means first silicon tests the chip rather than the program.
It feeds the product's design release as part of being ready for first silicon.
The test program loads, runs end to end and bins correctly on the tester with its hardware before silicon arrives, so first silicon tests the chip rather than the program.
13 more sections for registered members.