1. Purpose of the gate
The production test release approves the test program, hardware, limits, flows and operator instructions for volume production under change control, with the test quality sign-off in place.
It is evidence for the product's production release, and for multi-die products it makes known good die available for assembly.
The test program, its hardware, limits, flows and operator instructions are released for volume production under change control, with the test quality sign-off in place.
13 more sections for registered members.