1. Purpose of the gate
Plan approval is the largest commitment the business makes before silicon exists. Up to this point the money spent is on understanding the product; from here, it is on building it. The product lifecycle sets six criteria: product requirements agreed and traceable to the market requirements, make, buy or partner decisions recorded with their reasons, cost, price and schedule targets agreed, engineering resources and budget committed, quality and reliability targets set for the intended markets, and the top risks tracked.
The gate also changes how the product is managed. At plan approval the product requirements are baselined and the integrated schedule across every engineering lifecycle and business function is baselined with them. From this point, changes to requirements go through change control with their cost and schedule impact stated, and the risk register becomes a living document reviewed at every later gate.
Several engineering gates meet here. The SoC lifecycle's product plan agreed is the same decision. A frozen SoC specification is the strongest evidence that the product requirements can be met at the agreed cost and schedule, so many organisations hold specification freeze just before or alongside this gate. The IP lifecycle's plan approval brings the make or buy view for each block, and the FPGA lifecycle's device selection brings the chosen device, its availability and its own lifecycle into the cost, supply and end-of-life plans.
| Engineering gate | Lifecycle | Relation | What it brings to this gate |
|---|---|---|---|
| Product plan agreed | SoC | Matches | The chip's product plan and architecture specification, agreed as part of this commit. |
| Specification freeze | SoC | Feeds | A frozen architecture specification and performance and power targets, showing the requirements can be met. |
| IP plan approved | IP | Feeds | The IP business case and supplier shortlist behind each make, buy or partner choice for blocks. |
| Device selected | FPGA | Feeds | The device selection report and the device availability and lifecycle check. |