Run by the stage lead before fault injection sign-off, to confirm the exit criteria, outputs and reviews are complete.
MustFunctional coverage goals is met, exclusions reviewed.
MustFault injection campaigns is run to the plan for every protected function.
MustFaults neither corrected nor detected is explained, accepted or fixed.
MustUpset rate prediction updated with the results is done.
24 more items for registered members.
The full lifecycle detail, with its charts, flows, tables and every section, is for registered members. Registration is free and takes a minute. You come back to this page afterwards.