Guides each regular yield review during the ramp and in volume production. The yield enhancement engineer runs it with product engineering, the foundry and test.
MustFab, sort and final test data for the period are complete.
MustYield is compared with the plan.
ShouldTrends are shown by lot, wafer and site.
MustMain loss causes are ranked.
28 more items for registered members.
The full lifecycle detail, with its charts, flows, tables and every section, is for registered members. Registration is free and takes a minute. You come back to this page afterwards.