Before the process baseline freeze gate: does the flow run end to end with devices near target, and can the baseline be frozen? The process integration lead checks.
MustFull-flow lots have completed end to end and their electrical results are reviewed lot by lot.
MustEvery device on the menu is compared with its targets, with variability shown alongside mean values.
MustRemaining device offsets and tuning plans are stated.
MustShort-loop findings are closed, or carried as owned actions with a stated effect on the baseline.