Before the ramp complete gate: is yield mature, is the process in control and have sustaining owners accepted it? The manufacturing operations and capacity lead confirms.
MustEvery controlled parameter has control limits based on production data, not development targets alone.
MustKey parameters are in statistical control across tools and, where relevant, across fabs.
MustYield is at the mature level in the plan, held over the period the plan requires, and reported by product and by loss type.
MustVolume output reports show starts and outs at the planned level.