Before Device qualified and Module qualified, the reliability qualification lead confirms all stresses passed, failures are analysed, the lifetime model supports the mission profile and the module has passed its own qualification.
MustAll planned stresses are complete and passed to the chosen standard.
SeeStandard: AEC-Q101
MustGate oxide lifetime and threshold drift are within the limits in the plan.
MustBody diode stability is confirmed.
MustHumidity with bias results show no termination or passivation weakness.
28 more items for registered members.
The full lifecycle detail, with its charts, flows, tables and every section, is for registered members. Registration is free and takes a minute. You come back to this page afterwards.