Held for each new tool before release to the pilot line.
MustAcceptance criteria were agreed with the supplier before shipment.
MustAcceptance used the provider's own structures and materials.
MustTool software and recipes are under change control from acceptance.
MustEvery requirement is traced to a module target and to an acceptance test.
MustAcceptance was shown on the provider's product-like material, not only supplier test material.
29 more items for registered members.
The full lifecycle detail, with its charts, flows, tables and every section, is for registered members. Registration is free and takes a minute. You come back to this page afterwards.