Held before qualification lots start and again before the Technology qualified gate.
MustQualification lots are built on the frozen baseline with genealogy to die and material lot.
MustUse conditions, stresses, sample sizes, readpoints and acceptance rules are stated in the plan.
ShouldFailure analysis capacity is reserved for the qualification period.
MustEvery qualification lot was built on the frozen baseline, with genealogy to die and material lot.
29 more items for registered members.
The full lifecycle detail, with its charts, flows, tables and every section, is for registered members. Registration is free and takes a minute. You come back to this page afterwards.