The electrical Characterization Engineer closes Test & Characterisation with this before its gate, checking exit criteria, work products, quality checks, decisions and hand-offs.
MustEvery specified parameter is measured across conditions and reported in the characterisation report.
MustTest limits are set from characterisation data, with guard bands justified.
MustThe production test program and calibration program are released and correlated between test sites.
MustInterface conformance testing is complete and the report is filed as release evidence.
28 more items for registered members.
The full lifecycle detail, with its charts, flows, tables and every section, is for registered members. Registration is free and takes a minute. You come back to this page afterwards.