Use to prepare and run the Qualification passed gate: entry criteria, evidence, decisions frozen, readiness, participants, interoperability and compliance evidence where relevant, and the decision record. Run by the gate chair with the reliability qualification lead.
MustQualification stresses: passed to the plan, to published methods such as JEDEC or AEC-Q103.
MustParametric drift after stress: within the limits in the specification.
MustFailures: every failure analysed, with root cause and action.
MustQualification report is in the evidence pack at final maturity.
26 more items for registered members.
The full lifecycle detail, with its charts, flows, tables and every section, is for registered members. Registration is free and takes a minute. You come back to this page afterwards.