Use when design hands the die, test modes and repair scheme to the test team for first silicon. Run by the circuit design lead with the memory test lead.
MustThe test mode specification is final.
MustThe redundancy and repair scheme is final, with fuse maps.
MustThe pin and pad list and power sequence are documented.
14 more items for registered members.
The full lifecycle detail, with its charts, flows, tables and every section, is for registered members. Registration is free and takes a minute. You come back to this page afterwards.