Used when the verified and validated design passes to manufacturing, so production builds the device that was validated.
MustThe device master record draft lists every specification, drawing, software version and procedure.
MustEssential design outputs for proper function are identified.
MustProduction test specifications for chips, boards and devices are released.
21 more items for registered members.
The full lifecycle detail, with its charts, flows, tables and every section, is for registered members. Registration is free and takes a minute. You come back to this page afterwards.