The exit check for Production Release & Manufacturing Ramp, covering exit criteria, work products, quality checks, compliance evidence and decisions before its gates. Run by the programme manager with the stage leads.
MustReleased bill of materials, drawings and manufacturing process instructions are under configuration control.
MustThe factory acceptance test procedure is released and every shipped tool passes it.
MustCritical suppliers are qualified with capacity, and second source decisions are recorded.
MustService readiness is in place: spares, procedures and trained staff.
MustThe regulatory conformity file, declaration of conformity and materials compliance declarations are released.
MustBuild quality and cycle time are at the planned level and the standard cost is set.