Used before work on Detailed Design, Units & Unit Verification starts, to confirm the opening gate is passed, the inputs are ready and the people and plan are in place. Run by the embedded software architect with the stage leads.
MustArchitecture baselined, which closes System, Software & Hardware Architecture, has been passed or its open conditions are tracked with owners.
MustSoftware architecture description is available at the maturity this stage needs.
MustA embedded Software Engineer is assigned and has time planned for this stage.
20 more items for registered members.
The full lifecycle detail, with its charts, flows, tables and every section, is for registered members. Registration is free and takes a minute. You come back to this page afterwards.