This thread is for discussing the lifecycle document "Baselines and configuration management: procedure".
The procedure for configuration management on a chip programme: identifying configuration items, setting and auditing baselines at freezes, controlling changes to them, and keeping status records. Based on the ideas in ISO 10007 and IEEE 828. For configuration managers, design and verification leads, and release engineers.
Read the document: https://www.thesemiconhub.com/lifecycle/documents/procedures/baseline-configuration
Point out anything that is wrong, unclear or missing, and say which section you mean. Reviewers read this thread when they audit the document.