This thread is for discussing the lifecycle document "Process design frozen: gate review pack".
The review that freezes the manufacturing route once the process flow, process FMEA, pre-launch control plan, process instructions, measurement system analysis plan, capability study plan, packaging and labelling and sub-tier approvals are in place, so a production trial can be built on it. For process, quality, test, metrology, supplier quality and logistics engineers.
Read the document: https://www.thesemiconhub.com/lifecycle/apqp/gates/apqp-process-frozen/document
Point out anything that is wrong, unclear or missing, and say which section you mean. Reviewers read this thread when they audit the document.