This thread is for discussing the lifecycle document "Verification complete: gate review pack".
The review at which requirements-based verification is complete on the target, structural coverage and the advanced hardware methods are complete or justified, open problem reports are assessed and the system safety assessment is closed for the baseline. For verification engineers and architects, software testers, safety analysts and process assurance.
Read the document: https://www.thesemiconhub.com/lifecycle/avionics/gates/avi-verification-complete/document
Point out anything that is wrong, unclear or missing, and say which section you mean. Reviewers read this thread when they audit the document.