This thread is for discussing the lifecycle document "Supply and obsolescence review: gate review pack".
The regular review of whether the part can still be supplied: process, package, materials and test equipment, die and wafer bank levels, change notifications and their requalification, and field anomalies, leading to actions such as a bank top-up, a redesign or a last-time buy. For obsolescence, supply, quality and product line leads.
Read the document: https://www.thesemiconhub.com/lifecycle/space/gates/spc-obsolescence-review/document
Point out anything that is wrong, unclear or missing, and say which section you mean. Reviewers read this thread when they audit the document.