This thread is for discussing the lifecycle document "IP views complete: gate review pack".
The review that confirms the block's test structures, timing constraints and models, and for a hard block its physical views, are ready for an integrator. Covers the evidence for each view, the consistency between views and the questions SoC teams ask. Written for DFT, timing and implementation engineers and SoC physical design and DFT teams.
Read the document: https://www.thesemiconhub.com/lifecycle/ip/gates/ip-views-complete/document
Point out anything that is wrong, unclear or missing, and say which section you mean. Reviewers read this thread when they audit the document.